• Type: East Tailings / Dam Lift
  • Localisation: Mazapil, Mexico
  • Surface: 89.970 m²
  • Product: COLETANCHE® ES3

 

The first stage of the East Tailings Dam at Minera Peñasquito was waterproofed with a 60 mil LLDPE. All subsequent lifts above elevation1862,7 were planned to be built with rockfill. Continued waterproofing with LLDPE would have required a 0,70 m bedding layer for GCL, a GCL layer, a 0,30 m GCL cover layer, a 0,15 m soil liner and the LLDPE. Both the customer and the consultant wanted a simpler solution to waterproof the upstream face of the dam.

The first lift is 13-meter-high with a slope of 2, 9H:1V.

The solution finally chosen was to use COLETANCHE ES3 deployed on top of a 0,50 m layer of well graded gravel to serve as a transition between the rockfill and the membrane.

To minimize material waste COLETANCHE ES3 was manufactured in 45 m special length rolls.

The main reasons to choose COLETANCHE ® for this project included:

  • Its elevated traction and puncturing resistance.
  • Minimal requirements for preparation of the support surface
  • Possibility of connecting to polymeric membranes

bloc info
Homepage
bloc info
Environmental protection
bloc info
Hydraulic structures
bloc info
Transport
Close

We collect and/or access information stored on a terminal, such as cookies, and process personal data, such as unique identifiers and standard information sent by each terminal to measure content performance, obtain audience data, and develop and improve our products.
With your permission, we may use precise geolocation and identification data through those terminal analysis.
By clicking, you can consent to the processing described above.
You may also refuse to give your consent.
Please note that some processing of your personal data may not require your consent, but you have the right to object. Your preferences will only apply to this website.


I agree to the collect and processing of data to measure content performance and obtain audience data

I agree I refuse